Lake County residential building permits
Housing units, buildings and construction value authorized by building permits in Lake County and each of its 16 permit issuing places, from the US Census Bureau Building Permits Survey. The county is the sum of its places. Consumer spending in Lake County.
Places in Lake County, latest figures
Sort any column; select a place to open its card. A county permit office issues permits for the unincorporated area, or for the whole county where no city issues its own.
| Area | Type | Latest month | Units, last 12 months | Change | One unit | Five or more | Value, last 12 months | Annual table | Units that year |
|---|---|---|---|---|---|---|---|---|---|
| Lake Balance of County | County permit office | Nov 1990 | 1,439 | +11.9% | 1,346 | 11 | $89,497,584 | 1989 | 1,331 |
| Lake County Unincorporated Area | County permit office | Aug 2026 | 1,110 | -0.1% | 1,110 | 0 | $336,806,245 | 2025 | 1,059 |
| Astatula town | Municipality | Aug 2026 | 79 | +107.9% | 79 | 0 | $24,075,857 | 2025 | 46 |
| Clermont | Municipality | Aug 2026 | 1,061 | -10.5% | 855 | 0 | $208,952,850 | 2025 | 1,148 |
| Eustis | Municipality | Aug 2026 | 346 | +116.3% | 326 | 0 | $86,352,832 | 2025 | 166 |
| Fruitland Park | Municipality | Aug 2026 | 243 | -2.4% | 45 | 198 | $47,914,685 | 2025 | 71 |
| Groveland | Municipality | Aug 2026 | 319 | -11.6% | 307 | 0 | $143,068,160 | 2025 | 363 |
| Howey-in-the-Hills town | Municipality | Aug 2026 | 38 | +40.7% | 38 | 0 | $12,464,860 | 2025 | 4 |
| Lady Lake town | Municipality | Aug 2026 | 68 | +6.2% | 68 | 0 | $10,011,663 | 2025 | 67 |
| Leesburg | Municipality | Aug 2026 | 278 | -42.8% | 274 | 0 | $119,384,394 | 2025 | 225 |
| Mascotte | Municipality | Aug 2026 | 224 | -20.0% | 224 | 0 | $49,031,205 | 2025 | 331 |
| Minneola | Municipality | Aug 2026 | 442 | +2.3% | 442 | 0 | $196,968,733 | 2025 | 1,155 |
| Montverde | Municipality | Apr 1989 | 0 | n/a | 0 | 0 | $0 | 1988 | 0 |
| Mount Dora | Municipality | Aug 2026 | 377 | +20.4% | 315 | 0 | $70,445,936 | 2025 | 377 |
| Tavares | Municipality | Aug 2026 | 217 | -22.8% | 217 | 0 | $65,812,034 | 2025 | 236 |
| Umatilla | Municipality | Aug 2026 | 48 | -56.0% | 48 | 0 | $9,857,520 | 2025 | 94 |
County and places
Lake CountyCounty total12 months to Aug 2026: 4,850 units, -4.8%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 456 |
| Units, 12 months to Aug 2026 | 4,850 |
| Change on the 12 months before | -4.8% |
| Of which one unit buildings | 4,348 |
| Of which buildings of five or more units | 198 |
| Construction value, the same 12 months | $1,381,146,974 |
| Change in value | -2.7% |
| Units, annual table, 2025 | 5,342 |
| Change on 2024 | +7.1% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only |
|---|---|---|---|---|---|
| 2025 | 5,342 | 3,999 | 1,247 | $1,492,388,131 | 4,682 |
| 2024 | 4,990 | 4,147 | 814 | $1,345,452,943 | 3,649 |
| 2023 | 6,316 | 6,091 | 200 | $1,775,502,413 | 4,998 |
| 2022 | 5,402 | 5,054 | 306 | $1,514,478,791 | 3,876 |
| 2021 | 4,505 | 4,458 | 11 | $1,192,697,118 | 4,356 |
| 2020 | 3,923 | 3,533 | 365 | $992,065,484 | 2,515 |
| 2019 | 3,497 | 3,104 | 377 | $886,421,202 | 3,483 |
| 2018 | 3,330 | 2,993 | 325 | $826,342,645 | 3,273 |
| 2017 | 3,360 | 3,216 | 138 | $971,292,139 | 2,424 |
| 2016 | 3,966 | 3,409 | 528 | $1,061,060,771 | 3,444 |
| 2015 | 2,778 | 2,598 | 176 | $727,651,299 | 2,473 |
| 2014 | 2,488 | 1,890 | 571 | $553,492,403 | 2,430 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Lake County. Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025. County figures are the sum of the county's permit issuing places.
Lake Balance of CountyCounty permit office12 months to Nov 1990: 1,439 units, +11.9%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Nov 1990) | 105 |
| Units, 12 months to Nov 1990 | 1,439 |
| Change on the 12 months before | +11.9% |
| Of which one unit buildings | 1,346 |
| Of which buildings of five or more units | 11 |
| Construction value, the same 12 months | $89,497,584 |
| Change in value | +21.8% |
| Units, annual table, 1989 | 1,331 |
| Change on 1988 | +22.1% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 1989 | 1,331 | 1,206 | 35 | $76,631,447 | 1,331 | 12 |
| 1988 | 1,090 | 938 | 5 | $59,550,437 | 1,090 | 12 |
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Lake Balance of County. Monthly: monthly figures as first published, before late reports and corrections, Oct 1988 to Nov 1990, 26 months. Annual table 1988 to 1989.
Lake County Unincorporated AreaCounty permit office12 months to Aug 2026: 1,110 units, -0.1%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 115 |
| Units, 12 months to Aug 2026 | 1,110 |
| Change on the 12 months before | -0.1% |
| Of which one unit buildings | 1,110 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $336,806,245 |
| Change in value | +2.2% |
| Units, annual table, 2025 | 1,059 |
| Change on 2024 | -14.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 1,059 | 1,059 | 0 | $310,919,445 | 1,059 | 12 |
| 2024 | 1,242 | 1,242 | 0 | $384,694,649 | 128 | 1 |
| 2023 | 1,161 | 1,161 | 0 | $362,609,375 | 0 | 0 |
| 2022 | 1,233 | 1,228 | 5 | $384,026,135 | 0 | 0 |
| 2021 | 1,418 | 1,413 | 5 | $442,725,449 | 1,418 | 12 |
| 2020 | 1,263 | 1,258 | 5 | $391,444,411 | 0 | 0 |
| 2019 | 1,130 | 1,120 | 10 | $348,568,818 | 1,130 | 12 |
| 2018 | 954 | 949 | 5 | $297,617,472 | 902 | 11 |
| 2017 | 730 | 700 | 30 | $255,270,239 | 288 | 6 |
| 2016 | 813 | 783 | 30 | $282,277,707 | 296 | 5 |
| 2015 | 820 | 788 | 32 | $272,428,766 | 732 | 11 |
| 2014 | 992 | 685 | 291 | $264,493,957 | 992 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Lake County Unincorporated Area (named LAKE CO. UNINC. AREA (1980 to 1982); LAKE BAL. OF CO (1983 to 1983); Lake Bal. of Co. (1987 to 1987); LAKE BAL. OF CO. (1984 to 1988); Lake County Unincorporated Area (1990 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 438 months. Annual table 1980 to 2025.
Astatula townMunicipality12 months to Aug 2026: 79 units, +107.9%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 19 |
| Units, 12 months to Aug 2026 | 79 |
| Change on the 12 months before | +107.9% |
| Of which one unit buildings | 79 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $24,075,857 |
| Change in value | +128.8% |
| Units, annual table, 2025 | 46 |
| Change on 2024 | +170.6% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 46 | 46 | 0 | $12,933,737 | 46 | 12 |
| 2024 | 17 | 17 | 0 | $4,716,330 | 17 | 12 |
| 2023 | 75 | 75 | 0 | $20,033,827 | 75 | 12 |
| 2022 | 13 | 13 | 0 | $3,473,650 | 13 | 12 |
| 2021 | 19 | 19 | 0 | $4,001,404 | 19 | 12 |
| 2020 | 11 | 11 | 0 | $1,656,819 | 11 | 12 |
| 2019 | 11 | 11 | 0 | $1,382,271 | 11 | 12 |
| 2018 | 3 | 3 | 0 | $235,000 | 3 | 12 |
| 2017 | 9 | 9 | 0 | $1,481,187 | 9 | 12 |
| 2016 | 4 | 4 | 0 | $500,000 | 4 | 12 |
| 2015 | 9 | 9 | 0 | $1,046,233 | 0 | 0 |
| 2014 | 8 | 8 | 0 | $929,985 | 8 | 10 |
The chart and the download carry every year from 2013; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2015: months add to no months, annual table 9 units. Annual table only: no monthly record for this place and year.
- 2016: months add to no months, annual table 4 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2017: months add to no months, annual table 9 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2018: months add to no months, annual table 3 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2019: months add to no months, annual table 11 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2020: months add to no months, annual table 11 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2021: months add to 4, annual table 19 units. Only 3 of 12 months have a revised record.
US Census Bureau Building Permits Survey, Astatula town. Monthly: the Bureau's final revised monthly records (Aug 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Aug 2013 to Aug 2026, 76 months. Annual table 2013 to 2025.
ClermontMunicipality12 months to Aug 2026: 1,061 units, -10.5%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 84 |
| Units, 12 months to Aug 2026 | 1,061 |
| Change on the 12 months before | -10.5% |
| Of which one unit buildings | 855 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $208,952,850 |
| Change in value | -12.0% |
| Units, annual table, 2025 | 1,148 |
| Change on 2024 | +33.2% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 1,148 | 561 | 569 | $222,990,401 | 1,148 | 12 |
| 2024 | 862 | 534 | 328 | $151,601,347 | 862 | 12 |
| 2023 | 690 | 478 | 200 | $109,651,702 | 690 | 12 |
| 2022 | 830 | 519 | 295 | $139,306,118 | 830 | 12 |
| 2021 | 662 | 662 | 0 | $124,283,243 | 662 | 12 |
| 2020 | 489 | 480 | 0 | $99,603,414 | 489 | 12 |
| 2019 | 505 | 433 | 70 | $104,474,454 | 505 | 12 |
| 2018 | 707 | 377 | 320 | $110,444,746 | 707 | 12 |
| 2017 | 518 | 420 | 96 | $84,382,564 | 518 | 12 |
| 2016 | 764 | 484 | 258 | $121,263,204 | 764 | 12 |
| 2015 | 326 | 322 | 0 | $60,187,796 | 326 | 12 |
| 2014 | 551 | 263 | 280 | $64,619,072 | 551 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Clermont (named CLERMONT (1980 to 1988); Clermont (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Sep 1988); the Bureau's final revised monthly records (Aug 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 166 months. Annual table 1980 to 2025.
EustisMunicipality12 months to Aug 2026: 346 units, +116.3%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 52 |
| Units, 12 months to Aug 2026 | 346 |
| Change on the 12 months before | +116.3% |
| Of which one unit buildings | 326 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $86,352,832 |
| Change in value | +101.3% |
| Units, annual table, 2025 | 166 |
| Change on 2024 | -5.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 166 | 164 | 0 | $44,651,546 | 166 | 12 |
| 2024 | 176 | 172 | 0 | $49,851,310 | 176 | 12 |
| 2023 | 137 | 131 | 0 | $32,742,491 | 137 | 12 |
| 2022 | 179 | 163 | 6 | $41,840,556 | 179 | 12 |
| 2021 | 63 | 37 | 0 | $14,531,446 | 63 | 12 |
| 2020 | 157 | 23 | 130 | $28,510,807 | 157 | 12 |
| 2019 | 24 | 22 | 0 | $7,240,620 | 24 | 12 |
| 2018 | 33 | 31 | 0 | $9,663,105 | 33 | 12 |
| 2017 | 66 | 62 | 0 | $18,840,729 | 66 | 12 |
| 2016 | 120 | 113 | 0 | $29,819,234 | 120 | 12 |
| 2015 | 240 | 96 | 144 | $36,420,123 | 240 | 12 |
| 2014 | 112 | 112 | 0 | $32,654,753 | 112 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Eustis (named EUSTIS (1980 to 1988); Eustis (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
Fruitland ParkMunicipality12 months to Aug 2026: 243 units, -2.4%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 5 |
| Units, 12 months to Aug 2026 | 243 |
| Change on the 12 months before | -2.4% |
| Of which one unit buildings | 45 |
| Of which buildings of five or more units | 198 |
| Construction value, the same 12 months | $47,914,685 |
| Change in value | -12.0% |
| Units, annual table, 2025 | 71 |
| Change on 2024 | -72.6% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 71 | 23 | 48 | $19,716,760 | 71 | 12 |
| 2024 | 259 | 34 | 222 | $54,988,981 | 259 | 12 |
| 2023 | 23 | 23 | 0 | $8,756,734 | 23 | 12 |
| 2022 | 10 | 10 | 0 | $3,988,064 | 10 | 12 |
| 2021 | 18 | 16 | 0 | $6,907,364 | 18 | 12 |
| 2020 | 97 | 97 | 0 | $35,331,769 | 97 | 12 |
| 2019 | 103 | 99 | 0 | $35,930,590 | 103 | 12 |
| 2018 | 220 | 220 | 0 | $51,516,102 | 220 | 12 |
| 2017 | 727 | 727 | 0 | $274,605,024 | 661 | 11 |
| 2016 | 865 | 865 | 0 | $312,319,047 | 865 | 12 |
| 2015 | 564 | 564 | 0 | $162,174,775 | 564 | 12 |
| 2014 | 10 | 10 | 0 | $1,463,643 | 10 | 12 |
The chart and the download carry every year from 1982; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Fruitland Park (named FRUITLAND PARK (1982 to 1988); Fruitland Park (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1982 to 2025.
GrovelandMunicipality12 months to Aug 2026: 319 units, -11.6%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 33 |
| Units, 12 months to Aug 2026 | 319 |
| Change on the 12 months before | -11.6% |
| Of which one unit buildings | 307 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $143,068,160 |
| Change in value | -12.9% |
| Units, annual table, 2025 | 363 |
| Change on 2024 | +11.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 363 | 355 | 0 | $164,079,166 | 126 | 2 |
| 2024 | 325 | 317 | 0 | $145,172,361 | 325 | 12 |
| 2023 | 251 | 251 | 0 | $92,536,951 | 251 | 12 |
| 2022 | 435 | 435 | 0 | $146,197,671 | 435 | 12 |
| 2021 | 674 | 674 | 0 | $201,292,121 | 674 | 12 |
| 2020 | 539 | 539 | 0 | $156,163,490 | 539 | 12 |
| 2019 | 553 | 553 | 0 | $156,744,865 | 553 | 12 |
| 2018 | 611 | 611 | 0 | $167,687,739 | 611 | 12 |
| 2017 | 402 | 402 | 0 | $116,283,455 | 0 | 0 |
| 2016 | 378 | 378 | 0 | $112,009,528 | 378 | 12 |
| 2015 | 304 | 304 | 0 | $80,496,322 | 123 | 6 |
| 2014 | 337 | 337 | 0 | $85,659,164 | 292 | 10 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2018: months add to 419, annual table 611 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Groveland (named GROVELAND (1980 to 1988); Groveland (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 333 months. Annual table 1980 to 2025.
Howey-in-the-Hills townMunicipality12 months to Aug 2026: 38 units, +40.7%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 0 |
| Units, 12 months to Aug 2026 | 38 |
| Change on the 12 months before | +40.7% |
| Of which one unit buildings | 38 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $12,464,860 |
| Change in value | +44.3% |
| Units, annual table, 2025 | 4 |
| Change on 2024 | -94.4% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 4 | 4 | 0 | $1,686,478 | 4 | 12 |
| 2024 | 72 | 72 | 0 | $23,040,000 | 72 | 12 |
| 2023 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2022 | 0 | 0 | 0 | $0 | 0 | 12 |
| 2021 | 3 | 3 | 0 | $936,000 | 0 | 0 |
| 2020 | 1 | 1 | 0 | $312,000 | 0 | 0 |
| 2019 | 1 | 1 | 0 | $312,000 | 0 | 0 |
| 2018 | 1 | 1 | 0 | $312,000 | 0 | 0 |
| 2017 | 1 | 1 | 0 | $312,000 | 0 | 0 |
| 2016 | 2 | 2 | 0 | $624,000 | 0 | 1 |
| 2015 | 1 | 1 | 0 | $312,000 | 0 | 0 |
| 2014 | 1 | 1 | 0 | $312,000 | 1 | 6 |
The chart and the download carry every year from 2003; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2022: months add to 2, annual table 0 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2023: months add to 1, annual table 0 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2024: months add to 0, annual table 72 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
- 2025: months add to 46, annual table 4 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Howey-in-the-Hills town. Monthly: monthly figures as first published, before late reports and corrections (Jan 2003 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 2003 to Aug 2026, 284 months. Annual table 2003 to 2025.
Lady Lake townMunicipality12 months to Aug 2026: 68 units, +6.2%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 6 |
| Units, 12 months to Aug 2026 | 68 |
| Change on the 12 months before | +6.2% |
| Of which one unit buildings | 68 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $10,011,663 |
| Change in value | +5.9% |
| Units, annual table, 2025 | 67 |
| Change on 2024 | -19.3% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 67 | 67 | 0 | $9,873,740 | 0 | 0 |
| 2024 | 83 | 83 | 0 | $12,211,542 | 27 | 2 |
| 2023 | 57 | 57 | 0 | $8,457,406 | 57 | 12 |
| 2022 | 124 | 124 | 0 | $16,961,421 | 0 | 0 |
| 2021 | 146 | 146 | 0 | $19,958,176 | 0 | 0 |
| 2020 | 126 | 126 | 0 | $17,260,418 | 0 | 0 |
| 2019 | 104 | 104 | 0 | $14,128,665 | 104 | 12 |
| 2018 | 122 | 122 | 0 | $17,087,125 | 122 | 12 |
| 2017 | 85 | 85 | 0 | $10,794,789 | 62 | 8 |
| 2016 | 71 | 71 | 0 | $8,672,845 | 71 | 12 |
| 2015 | 65 | 65 | 0 | $7,081,422 | 65 | 12 |
| 2014 | 42 | 42 | 0 | $4,664,776 | 42 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Lady Lake town (named LADY LAKE TOWN (1980 to 1988); Lady Lake Town (1987 to 1988); Lady Lake town (1988 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
LeesburgMunicipality12 months to Aug 2026: 278 units, -42.8%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 32 |
| Units, 12 months to Aug 2026 | 278 |
| Change on the 12 months before | -42.8% |
| Of which one unit buildings | 274 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $119,384,394 |
| Change in value | -3.0% |
| Units, annual table, 2025 | 225 |
| Change on 2024 | -58.4% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 225 | 219 | 0 | $95,647,090 | 225 | 12 |
| 2024 | 541 | 269 | 264 | $113,935,088 | 541 | 12 |
| 2023 | 2,759 | 2,754 | 0 | $714,309,627 | 2,759 | 12 |
| 2022 | 1,199 | 1,191 | 0 | $305,754,044 | 1,199 | 12 |
| 2021 | 513 | 499 | 6 | $86,413,631 | 513 | 12 |
| 2020 | 363 | 347 | 6 | $59,043,887 | 363 | 12 |
| 2019 | 211 | 209 | 0 | $36,211,527 | 211 | 12 |
| 2018 | 212 | 212 | 0 | $36,200,349 | 212 | 12 |
| 2017 | 168 | 168 | 0 | $29,560,045 | 168 | 12 |
| 2016 | 191 | 191 | 0 | $32,895,299 | 191 | 12 |
| 2015 | 96 | 96 | 0 | $12,726,062 | 70 | 8 |
| 2014 | 77 | 77 | 0 | $10,326,564 | 77 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Leesburg (named LEESBURG (1980 to 1988); Leesburg (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
MascotteMunicipality12 months to Aug 2026: 224 units, -20.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 1 |
| Units, 12 months to Aug 2026 | 224 |
| Change on the 12 months before | -20.0% |
| Of which one unit buildings | 224 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $49,031,205 |
| Change in value | -41.1% |
| Units, annual table, 2025 | 331 |
| Change on 2024 | +6.4% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 331 | 317 | 6 | $79,106,886 | 211 | 7 |
| 2024 | 311 | 311 | 0 | $95,192,518 | 311 | 12 |
| 2023 | 157 | 157 | 0 | $28,418,343 | 0 | 0 |
| 2022 | 169 | 169 | 0 | $30,610,735 | 0 | 0 |
| 2021 | 192 | 192 | 0 | $34,670,254 | 192 | 12 |
| 2020 | 183 | 183 | 0 | $33,368,578 | 165 | 11 |
| 2019 | 162 | 162 | 0 | $28,539,711 | 162 | 12 |
| 2018 | 136 | 136 | 0 | $35,848,901 | 132 | 11 |
| 2017 | 69 | 69 | 0 | $16,976,051 | 67 | 9 |
| 2016 | 20 | 20 | 0 | $3,912,487 | 17 | 10 |
| 2015 | 2 | 2 | 0 | $299,399 | 2 | 12 |
| 2014 | 16 | 16 | 0 | $1,359,028 | 16 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2024: months add to 192, annual table 311 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Mascotte (named MASCOTTE (1980 to 1988); Mascotte (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
MinneolaMunicipality12 months to Aug 2026: 442 units, +2.3%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 48 |
| Units, 12 months to Aug 2026 | 442 |
| Change on the 12 months before | +2.3% |
| Of which one unit buildings | 442 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $196,968,733 |
| Change in value | +0.1% |
| Units, annual table, 2025 | 1,155 |
| Change on 2024 | +146.3% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 1,155 | 531 | 624 | $379,464,963 | 1,155 | 12 |
| 2024 | 469 | 469 | 0 | $161,180,848 | 469 | 12 |
| 2023 | 491 | 491 | 0 | $261,350,530 | 491 | 12 |
| 2022 | 609 | 609 | 0 | $309,775,442 | 609 | 12 |
| 2021 | 392 | 392 | 0 | $170,361,907 | 392 | 12 |
| 2020 | 215 | 215 | 0 | $95,042,043 | 215 | 12 |
| 2019 | 490 | 193 | 297 | $112,424,750 | 490 | 12 |
| 2018 | 135 | 135 | 0 | $55,307,242 | 135 | 12 |
| 2017 | 184 | 184 | 0 | $73,842,559 | 184 | 12 |
| 2016 | 212 | 212 | 0 | $79,040,868 | 212 | 12 |
| 2015 | 75 | 75 | 0 | $29,187,601 | 75 | 12 |
| 2014 | 75 | 75 | 0 | $28,309,571 | 75 | 12 |
The chart and the download carry every year from 2003; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2025: months add to 411, annual table 1,155 units. One or more months were imputed (source code 5 or 9); the Bureau's annual table uses the place's annual report or an annual imputation instead of the sum of imputed months.
US Census Bureau Building Permits Survey, Minneola. Monthly: monthly figures as first published, before late reports and corrections (Jan 2003 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 2003 to Aug 2026, 284 months. Annual table 2003 to 2025.
MontverdeMunicipality12 months to Apr 1989: 0 units, n/a
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Apr 1989) | 0 |
| Units, 12 months to Apr 1989 | 0 |
| Change on the 12 months before | n/a |
| Of which one unit buildings | 0 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $0 |
| Change in value | n/a |
| Units, annual table, 1988 | 0 |
| Change on 1987 | -100.0% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 1988 | 0 | 0 | 0 | $0 | 0 | 0 |
| 1987 | 6 | 6 | 0 | $289,200 | 5 | 2 |
| 1986 | 8 | 8 | 0 | $428,135 | 8 | 12 |
| 1985 | 3 | 3 | 0 | $189,000 | 3 | 12 |
| 1984 | 6 | 6 | 0 | $353,400 | 6 | 12 |
| 1983 | 4 | 4 | 0 | $163,200 | 4 | 9 |
| 1982 | 4 | 0 | 0 | $120,000 | 4 | 12 |
| 1981 | 3 | 3 | 0 | $130,353 | 3 | 12 |
| 1980 | 2 | 2 | 0 | $65,200 | 2 | 11 |
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Montverde (named MONTVERDE (1980 to 1988); Montverde (1987 to 1989) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections, Jan 1988 to Apr 1989, 16 months. Annual table 1980 to 1988.
Mount DoraMunicipality12 months to Aug 2026: 377 units, +20.4%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 40 |
| Units, 12 months to Aug 2026 | 377 |
| Change on the 12 months before | +20.4% |
| Of which one unit buildings | 315 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $70,445,936 |
| Change in value | +24.7% |
| Units, annual table, 2025 | 377 |
| Change on 2024 | +33.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 377 | 323 | 0 | $64,422,265 | 377 | 12 |
| 2024 | 282 | 276 | 0 | $54,364,416 | 282 | 12 |
| 2023 | 151 | 149 | 0 | $32,270,235 | 151 | 12 |
| 2022 | 272 | 264 | 0 | $50,191,666 | 272 | 12 |
| 2021 | 162 | 162 | 0 | $27,050,765 | 162 | 12 |
| 2020 | 137 | 135 | 0 | $28,253,242 | 137 | 12 |
| 2019 | 150 | 144 | 0 | $28,983,284 | 150 | 12 |
| 2018 | 129 | 129 | 0 | $28,021,238 | 129 | 12 |
| 2017 | 119 | 119 | 0 | $28,309,180 | 119 | 12 |
| 2016 | 127 | 127 | 0 | $26,158,112 | 127 | 12 |
| 2015 | 78 | 78 | 0 | $19,753,144 | 78 | 12 |
| 2014 | 71 | 68 | 0 | $15,838,575 | 71 | 12 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Mount Dora (named MOUNT DORA TOWN (1980 to 1980); MOUNT DORA (1981 to 1988); Mount Dora (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
TavaresMunicipality12 months to Aug 2026: 217 units, -22.8%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 20 |
| Units, 12 months to Aug 2026 | 217 |
| Change on the 12 months before | -22.8% |
| Of which one unit buildings | 217 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $65,812,034 |
| Change in value | -20.6% |
| Units, annual table, 2025 | 236 |
| Change on 2024 | -1.7% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 236 | 236 | 0 | $70,897,395 | 0 | 0 |
| 2024 | 240 | 240 | 0 | $73,398,130 | 71 | 6 |
| 2023 | 344 | 344 | 0 | $99,570,182 | 344 | 12 |
| 2022 | 303 | 303 | 0 | $74,113,051 | 303 | 12 |
| 2021 | 231 | 231 | 0 | $57,175,623 | 231 | 12 |
| 2020 | 333 | 109 | 224 | $44,214,378 | 333 | 12 |
| 2019 | 40 | 40 | 0 | $9,239,747 | 40 | 12 |
| 2018 | 54 | 54 | 0 | $14,161,726 | 54 | 12 |
| 2017 | 263 | 251 | 12 | $57,518,057 | 263 | 12 |
| 2016 | 381 | 141 | 240 | $49,095,665 | 381 | 12 |
| 2015 | 191 | 191 | 0 | $44,262,819 | 191 | 12 |
| 2014 | 191 | 191 | 0 | $42,226,315 | 179 | 11 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
US Census Bureau Building Permits Survey, Tavares (named TAVARES (1980 to 1988); Tavares (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 464 months. Annual table 1980 to 2025.
UmatillaMunicipality12 months to Aug 2026: 48 units, -56.0%
Latest figures
| Measure | Figure |
|---|---|
| Units, latest month (Aug 2026) | 1 |
| Units, 12 months to Aug 2026 | 48 |
| Change on the 12 months before | -56.0% |
| Of which one unit buildings | 48 |
| Of which buildings of five or more units | 0 |
| Construction value, the same 12 months | $9,857,520 |
| Change in value | -51.5% |
| Units, annual table, 2025 | 94 |
| Change on 2024 | -15.3% |
Annual table, as published by the Bureau
| Year | Units | One unit | Five or more | Value | Units, reported only | Months reported |
|---|---|---|---|---|---|---|
| 2025 | 94 | 94 | 0 | $15,998,259 | 94 | 12 |
| 2024 | 111 | 111 | 0 | $21,105,423 | 109 | 11 |
| 2023 | 20 | 20 | 0 | $4,795,010 | 20 | 12 |
| 2022 | 26 | 26 | 0 | $8,240,238 | 26 | 12 |
| 2021 | 12 | 12 | 0 | $2,389,735 | 12 | 12 |
| 2020 | 9 | 9 | 0 | $1,860,228 | 9 | 12 |
| 2019 | 13 | 13 | 0 | $2,239,900 | 0 | 0 |
| 2018 | 13 | 13 | 0 | $2,239,900 | 13 | 12 |
| 2017 | 19 | 19 | 0 | $3,116,260 | 19 | 12 |
| 2016 | 18 | 18 | 0 | $2,472,775 | 18 | 12 |
| 2015 | 7 | 7 | 0 | $1,274,837 | 7 | 12 |
| 2014 | 5 | 5 | 0 | $635,000 | 4 | 11 |
The chart and the download carry every year from 1980; the twelve latest are listed here.
Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.
Years whose months do not add up to the annual table
- 2015: months add to no months, annual table 7 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2016: months add to no months, annual table 18 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2017: months add to no months, annual table 19 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2018: months add to no months, annual table 13 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2019: months add to no months, annual table 13 units. Annual table only: no monthly record for this place and year.
- 2020: months add to no months, annual table 9 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
- 2021: months add to 1, annual table 12 units. Only 3 of 12 months have a revised record.
US Census Bureau Building Permits Survey, Umatilla (named UMATILLA (1980 to 1988); Umatilla (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to May 2005); the Bureau's final revised monthly records (Aug 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 285 months. Annual table 1980 to 2025.
Sources on this page
- US Census Bureau: Building Permits Survey, place and county files from www2.census.gov/econ/bps: the South Region place files (annual table from 1980, monthly as first published from 1988, revised monthly records from 2013 and the current year's revised months) and the county annual table from 1990. Retrieved 2026-10-01. New privately owned residential buildings, housing units and construction value authorized, by structure size. Nominal dollars.
- Validated against the Bureau's annual table on every refresh and every build: where a place has a revised record for all twelve months, every month reported, and the Bureau built the annual figure from reports, the twelve months must add up to the annual table exactly or the build fails. The county table must equal the sum of its places for every county and year. Every other difference between a place's months and its annual table is published with the Bureau's reason, on the card and in the download.
- Imputed and missing months. A month the Bureau imputed because no report was received carries source code 5 and is shown in the chart's tooltip as imputed. From 2005 to 2021 the Bureau published monthly figures only for places in its monthly sample, so a place surveyed annually has no monthly figure for those years, and a county whose offices were all annual reporters has none either; from 2022 every place is surveyed monthly. Nothing is interpolated here. Annual figures are the Bureau's own annual table, never a sum made on this site.
- Sources and methods.
Download the data
Place monthly CSV (gzip) Place annual table CSV County monthly CSV County annual CSV Place registry CSV Annual differences CSV
One row per place and month with buildings, units and value by structure size, the basis of the figure and the Bureau's source code; the annual table with estimates and reported only columns; the same for counties; the place registry with every name the Bureau's files have used; and every place year whose months do not add up to the annual table, with the reason.